Ride through the rules.
We check data centres and other large loads against the grid's connection rules before they apply, so the engineering study you commission is the right one, done once.
Transgrid already asks NSW data centres to prove they can stay connected through a fault and recover. From 29 October, every site over 30 MW in the NEM has to show the network and AEMO the same thing, with models.
Finding out the usual way takes months and a paid engineering study. If the network comes back with conditions, you do the study again.
Preflight tells you first what applies and where you fall short. Your engineers study the right design, once.
Every trip around the top row costs a redesign, a second study and a quarter of your programme.
Drag to your connection size. The new rules switch on at 30 MW.
60MW
Applies at every size
New standards: live in NSW now, national from 29 October
Based on the draft rule. Final on 29 October 2026. A full screen adds your network, your build stages and your equipment.
Before the engineering study, not instead of it. Days instead of months, and one study instead of two.
The rules your site triggers, with the source for each one.
Your design against those rules: pass, fail, or not enough information yet.
The gaps that would block your application, and how similar projects were treated.
Based in Sydney, Australia.
Bring your site. Thirty minutes later you'll know your tier, what applies, and whether a full screen is worth it.